This weekend we attempted to better organize the storefront. We restacked the scrap wood that we're just not ready to get rid of, got rid of 2 pieces of carpet, swept up the leftover plaster from demo a year ago, and started ripping up the linoleum and plywood. It's looking like we'll need to replace about 10 of the 20' long 2"x10" floor joists and the original wood floor, which was beneath the

0 comments:

Post a Comment

Ads

 
Copyright © 2013. faulcon